Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2013/07/23
Orleans Conservation Commission                                 

Work Meeting    Nauset Room                     July 23, 2013
8:30 a.m.       Call to Order   

Continuations
Last Heard 7/2/13 (NO1, JT1)
Robert & Robin Bardwell                                 14 Pond View Road
by East Cape Engineering, Inc. Assessor’s Map 43, Parcel 11.  The proposed removal of an existing dwelling, construction of a new dwelling, gazebo, & plantings.  Work will occur within 100’ of the Top of a Coastal Bank & within the Pleasant Bay A.C.E.C.

Last Heard 7/2/13 (NO1, JT1)
Jacquelyn & Robert Moore II                             25 Primrose Lane
by Ryder & Wilcox, Inc.  Assessor’s Map 57, Parcel 22.  The proposed construction of a gabion revetment to stabilize an eroding Coastal Bank due to a failed fiber roll revetment.  Work will occur on a Coastal Bank, Coastal Beach, Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.

Last Heard 7/2/13 (NO1, JT1)
Kevin & Marcia Doherty                                  4 Duck Pond Lane
by Blue Flax Design.  Assessor’s Map 28, Parcel 153.  The after the fact filing for unauthorized cutting, filling, & grading in a Bordering Vegetated Wetland, mitigation of disturbed areas, & management of invasive species.  Work will occur in a Bordering Vegetated Wetland, within 100’ of the Edge of a Bordering Vegetated Wetland, & within 100’ of the Edge of Critchett’s Pond.    

Last Heard 7/16/13 (NO1, BR1)
Thomas & Diane Burnham                                  70 Captain Linnell Road
by Ryder & Wilcox, Inc. Assessor’s Map 32, Parcel 49.  The proposed construction of a single-family dwelling; installation of a septic system & utilities; & grading & landscaping.  Work will occur within 100’ of the Edge of Wetland.  

Last Heard 7/16/13 (NO1, BR1)
Burton G. Herman                                                9 Windswept Lane
by Ryder & Wilcox, Inc. Assessor’s Map 38, Parcel 6.  The proposed construction of an addition to an existing single family dwelling has been amended to expand an existing deck.  Work will occur within 100’ of the Top of a Coastal Bank.

Enforcement Order
Kevin & Marcia Doherty                                  4 Duck Pond Lane
The discussion of the Restoration Plan required under an Enforcement Order for the alteration of land within 50’ of the Edge of Wetland and an Critchett’s Pond. Update on progress and compliance.


Revised Plan
Hamish & Kathryn Wilkinson                              45 Bridge Road
The proposed construction of an addition to a single family dwelling has been revised to change the proposed building plan to 1.5 stories.  Work will occur within 100’ of the Edge of Salt Marsh and Land Subject to Coastal Storm Flowage.  

Administrative Reviews
Hamish & Kathryn Wilkinson                              45 Bridge Road
The proposed removal of 3 locust trees.  

Mary Bast                                                       128 Monument Road
The proposed request to extend the existing native planting buffer.  

Phyllis Thomason                                                25 S. Orleans Road
The proposed removal of bamboo on the Coastal Bank, maintenance, and plantings.  Work to be done by Cape Organics.  

Kathy Udall                                                     35 Keziahs Lane
The proposed pruning of a Black Oak.  Work to be done by The Tree Wizard.    

Request to Use Conservation Properties
Jonathan Young Windmill Celebrate our Waters Weekend    9/14/13-9/15/1
OPC                                     10am-12pm                               50 People

Chairman’s Business
Approval of the Minutes from the Meeting on May 7, 2013, and May 21, 2013

Other Member’s Business

Administrator’s Business

Site Visits
Richard A. Collison                                             189 Skaket Beach Road
by Ryder & Wilcox, Inc.  Assessor’s Map 23, Parcel 17.  The proposed upgrading of an existing septic system including the pumping & abandonment &/or removal of the existing system, & the installation of a water service to serve an existing single-family dwelling.  Work will occur within 100’ of a Coastal Dune System.  

Timothy F. Geithner                                             158 Tonset Road
by Ryder & Wilcox, Inc.  Assessor’s Map 27, Parcel 7.  The proposed repair of a timber stairway & the construction of a landing & steps onto an existing boathouse.  Work will occur on a Coastal Bank, on Land Subject to Coastal Storm Flowage, & a Coastal Beach.  

The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting.  Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.